SOCIETY OF PETROLEUM
ENGINEERS
Mid-Continent Section, Tulsa, Oklahoma
Second SPE Progressing Cavity Pump Workshop was held November 19, 1996 in conjunction with the University of Tulsa's Artificial Lift Projects advisory board meeting.
Abstracts courtesy of Ken Saveth, ken.saveth@centrilift.com
Download all abstracts (single document) in Word format (115,200K)
INDIVIDUAL ABSTRACTS ON THE INTERNET
"Designing PC Pumps for Abrasive Applications" - Majid Delpassand: Moyno Oilfield Products
"Updated Field Case Studies of Application and Performance of Bottom Drive Progressing Cavity Pumps" - Cam Hayworth: Reda Pumps
"Analysis and Optimization of Progressing Cavity Pump Systems by Total Well Management" - Jim McCoy: Echometer Company
"ISO Standards for PCPs" - Henri Cholet: Institute Frances de Petrole
Instrumented PC Pump Charge Pump - Came Matthews: Centre for Frontier Engineering Research, Inc.
Optimizing Artificial Lift Operations Through Use of Wireless Conveyed Real Time Bottom Hole Data - Tom Bandy, Earuch Broacha: ProTechnics
Coal Bed Methane - Case History - Norman Hein, Jr.: Conoco, Inc. & Wendell Beavers: Conoco Australia Pty., Ltd.
Progressing Cavity Pumps in Open Hole - Jim Tupman: Kudu Industries, Inc.
In-situ PC Pump Testing - Jose Luis Arrellano: University of Tulsa Artificial Lift Projects (TUALP)
Multilobe Progressing Cavity Pump: Operating Process Peculiarities, Geometrical Parameters Optimization & Fields of Operation - Dr. Fedor D. Balkenko: Russian State Oil & Gas Academy
Download all abstracts (single document) in Word format (115,200K)